PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacting along column line 1 from B-D Facing South (800x600).jpg Excavation at Rahway Ave. View from the 3rd Floor (800x600).jpg Installed electrical conduit at the Sprinklers Room (152A) Facing South (800x600).jpg Installing bearing plate boxes at Stair -2 (4th Floor) Facing South (800x600).jpg Lifted the slip forms to the 4th Floor at Elev. 1,2,3 Facing East (800x600).jpg
Previous page Lifted the slip forms to the 4th Floor at Elev. 1,2,3 Facing East (800x600)
Lifted the slip forms to the 4th Floor at Elev. 1,2,3 Facing East (800x600)